Your Location:
Home >
Browse articles >
Economic optimization of resource-constrained project scheduling: a two-phase metaheuristic approach
运筹学 | Updated:2022-08-31
    • Economic optimization of resource-constrained project scheduling: a two-phase metaheuristic approach

    • Economic optimization of resource-constrained project scheduling: a two-phase metaheuristic approach

    • 信息与电子工程前沿(英文)   2010年11卷第6期 页码:481-494
    • DOI:10.1631/jzus.C0910633    

      中图分类号:
    • 收稿:2009-10-22,

      修回:2010-05-14,

      录用:2009-12-07,

      纸质出版:2010-06

    Scan QR Code

  • Economic optimization of resource-constrained project scheduling: a two-phase metaheuristic approach[J]. 信息与电子工程前沿(英文), 2010,11(6):481-494. DOI: 10.1631/jzus.C0910633.

    H. L. CHEN, Chiuh-Cheng CHYU. Economic optimization of resource-constrained project scheduling: a two-phase metaheuristic approach[J]. Frontiers of Information Technology & Electronic Engineering, 2010, 11(6): 481-494. DOI: 10.1631/jzus.C0910633.

  •  
  •  
icon
The trial reading is over, you can activate your VIP account to continue reading.
Deactivate >
icon
The trial reading is over. You can log in to your account, go to the personal center, purchase VIP membership, and read the full text.
Already a VIP member?
Log in >

0

浏览量

15

Downloads

0

CSCD

>
文章被引用时,请邮件提醒。
Submit
工具集
下载
参考文献导出
分享
收藏
添加至我的专辑

相关文章

暂无数据

相关作者

暂无数据

相关机构

暂无数据
0